That is an exterior wall that has no insulation, we weren't surprised. The rest of the house has become a staging area for the new toilet, 2 new vanities and sinks, new walk in shower, new tile, new fixtures and rolls of insulation. The plumber is due tomorrow to make some changes and additions. In the mean time here is what we are using to shower with.
The Weekly Leaf
This weeks leaf was done on the gelli plate with a mask from Green Pepper press.
I ended up with a front and a back.
Week #27
Daily Stitching updates
Line Dance #182- #187
The Daily Paper #110 - #115
Today I sewed row #6 on and took a picture of the back which has its own unique design.
I fuse flannel to the back of each piece and frequently use up odd pieces that I have, so the back has a totally different pattern than the front.
No comments:
Post a Comment